Louvain:Hardware: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
| Line 60: | Line 60: | ||
|- | |- | ||
| valign="top" style="background-color: #f9f9f9; padding: 0px 10px 0px 3px;" |'''CPU:''' | | valign="top" style="background-color: #f9f9f9; padding: 0px 10px 0px 3px;" |'''CPU:''' | ||
| Intel Xeon Gold 5318Y (Ice Lake), x86_64, 2.10GHz, 2 CPUs/node, 24 cores/CPU<br/> | | Intel Xeon Gold 5318Y (Ice Lake-SP), x86_64, 2.10GHz, 2 CPUs/node, 24 cores/CPU<br/> | ||
|- | |- | ||
| valign="top" style="background-color: #f9f9f9; padding: 0px 10px 0px 3px;" |'''Memory:''' | | valign="top" style="background-color: #f9f9f9; padding: 0px 10px 0px 3px;" |'''Memory:''' | ||
| Line 79: | Line 79: | ||
* <span style="color:grey">eth5/ens4f3, Ethernet, model: Broadcom Inc. and subsidiaries NetXtreme BCM5719 Gigabit Ethernet PCIe, driver: tg3 - unavailable for experiment</span><br/> | * <span style="color:grey">eth5/ens4f3, Ethernet, model: Broadcom Inc. and subsidiaries NetXtreme BCM5719 Gigabit Ethernet PCIe, driver: tg3 - unavailable for experiment</span><br/> | ||
|- | |- | ||
|}''<small>Last generated from the Grid'5000 Reference API on 2025- | |}''<small>Last generated from the Grid'5000 Reference API on 2025-02-12 ([https://gitlab.inria.fr/grid5000/reference-repository/commit/c98ab6320f commit c98ab6320f])</small>'' | ||
Revision as of 11:05, 12 February 2025
Hardware: Global | Grenoble | Lille | Louvain | Luxembourg | Lyon | Nancy | Nantes | Rennes | Sophia | Strasbourg | Toulouse
See also: Network topology for Louvain
Summary
- 1 cluster
- 8 nodes
- 384 CPU cores
- 2.0 TiB RAM
- 8 SSDs and 8 HDDs on nodes (total: 35.85 TB)
- 41.8 TFLOPS (excluding GPUs)
Clusters summary
Testing queue resources
| Cluster | Access Condition | Date of arrival | Manufacturing date | Nodes | CPU | Memory | Storage | Network | |||
|---|---|---|---|---|---|---|---|---|---|---|---|
| # | Name | Cores | Architecture | ||||||||
| spirou | testing queue | 2024-10-02 | 2024-01-01 | 8 | 2 | Intel Xeon Gold 5318Y | 24 cores/CPU | x86_64 | 256 GiB | 480 GB SSD + 4.0 TB HDD | 100 Gbps (SR‑IOV) |
Clusters in the testing queue
spirou
8 nodes, 16 cpus, 384 cores (json)
Reservation example:
| Access condition: | testing queue |
| Model: | ThinkSystem SR630 V2 |
| Manufacturing date: | 2024-01-01 |
| Date of arrival: | 2024-10-02 |
| CPU: | Intel Xeon Gold 5318Y (Ice Lake-SP), x86_64, 2.10GHz, 2 CPUs/node, 24 cores/CPU |
| Memory: | 256 GiB |
| Storage: |
|
| Network: |
|
Last generated from the Grid'5000 Reference API on 2025-02-12 (commit c98ab6320f)