Nantes:Home: Difference between revisions
Jump to navigation
Jump to search
Abitaillou (talk | contribs) No edit summary |
Abitaillou (talk | contribs) No edit summary |
||
(One intermediate revision by the same user not shown) | |||
Line 4: | Line 4: | ||
{{Template:Site description|Nantes|nagios_group=Nantes|misc= | {{Template:Site description|Nantes|nagios_group=Nantes|misc= | ||
<center><gallery> | <center><gallery> | ||
Line 17: | Line 16: | ||
File:G5k-nantes-baie-004-milieu-20240703.jpg|250px|right|Econome cluster | File:G5k-nantes-baie-004-milieu-20240703.jpg|250px|right|Econome cluster | ||
</gallery></center> | </gallery></center> | ||
==== SeDuCe project ==== | |||
The ecotype cluster inherits from CPER SeDuCe. [https://seduceproject.github.io SeDuCe project] was on datacenter energy efficiency. So there is monitoring for servers, cooling, but also photovoltaic panels and batteries to bring green electricity. | |||
Some of the equipments are still working and under active monitoring (for example [https://api.grid5000.fr/stable/sites/nantes/metrics/dashboard/d/kwollect/kwollect-metrics?orgId=1&from=now-5m&to=now&timezone=browser&var-job_str=&var-device_id=inrow-Z1&var-metric_id=inrow_fan_speed_percent&var-metric_id=inrow_power_watt&var-metric_id=cooling_return_temperature_celsius&var-metric_id=cooling_supply_temperature_celsius cooling] and [https://api.grid5000.fr/stable/sites/nantes/metrics/dashboard/d/kwollect/kwollect-metrics?orgId=1&from=now-3h&to=now&timezone=browser&var-job_str=&var-device_id=entech&var-metric_id=inverter_output_power_watt PV production]). | |||
[[File:Ppv.jpg|thumb|center]] | |||
}} | }} |
Latest revision as of 17:45, 16 September 2025
The Nantes Grid'5000 site is hosted at IMT Atlantique in Nantes.
Details about Nantes site:
- Hardware: available hardware and their description
- Network: site network topology
- External access: additional way to access local resources
- People: contact points for the site (see Support for more information about how to report problems)
Resources status for Nantes site (see Status for the global Grid'5000 status):
SeDuCe project
The ecotype cluster inherits from CPER SeDuCe. SeDuCe project was on datacenter energy efficiency. So there is monitoring for servers, cooling, but also photovoltaic panels and batteries to bring green electricity. Some of the equipments are still working and under active monitoring (for example cooling and PV production).