==Project planning==
==Project planning==


[[Image:schedule.jpg|500px]]
[[Image:Grid5000_timeline.png|600px]]


==Roadmap==
==Roadmap==


== 15 Mars 2005 ==
*December 2005: Assessment on the first 9 months usage
* Automatisation du lancement. Faire une mesure du temps de démarrage d’XP : Olivier
** Report to Funding Institutions Scientific Committees (Michel Bidoit, Brigitte Plateau, Thierry Priol & 1 ACI Grid member)
* faire des démos en grandeur réelle (> 1000 CPU). Reprendre les démos du 9 Février mais avec beaucoup plus de processeurs : tous les responsables démos
** Brainstorming on how to budgetize at least 500 CPUs at each of the 9 sites (1000 for Orsay) to achieve the 5000 CPUs goal (some sites are already secured)
* Update des propositions de recherche : tous les membres du CP
** Brainstorming on how to budgetize 10 Gbps interfaces for RENATER (20 k$)
* Propositions de démonstration permanente : tous les membres du CP
*March 2006: Organize a Grid'5000 school where users can familiarize with scheduling/deploying tools
* Numéro spécial Grid’5000 à Parallel Computing : Frédéric
** Opening to ACI Masse de Données & ACI Sécurité communities for the Spring School (reach stability)
* Préparation du plan de l’article SC2005 : Franck
*Mid 2006: Opening to external communities and possibly "best effort" after first users reports
* Stand Grid’5000 à SC2005 : Franck contacte Alexandre Denis


==What has been done so far==


Calendrier d’ouverture à d’autres utilisateurs :
=== Financial Supports ===
-utilisateurs Grid’5000, ACI Grid (ouverture Fin Mars), en attendant utilisation en best effort : responsable CT ouvrent les comptes.
# "[http://www.recherche.gouv.fr/recherche/fns/grid.htm ACI Grid]" with 2 calls for Grid'5000
-utilisateurs ACI Masses de données, ACI Sécurité (attendre la stabilité)
# "[http://www.recherche.gouv.fr/recherche/fns/mdonnees.htm ACI Masse de Données]" with GriD eXplorer
-utilisateurs autres disciplines (attendre le retour d’expérience des utilisateurs ACI Masse de données)
# Local fundings (regions + departments)
 
# INRIA fundings
== Juin 2005 ==
# 2 "AS CNRS" (Grid5000 and Grid Programming)
* Journée bilan sur les 3 premiers mois d’utilisation.
=== Management and Internal Communication ===
# 1 Steering Committee + 1 Technical Committee
# Frequent audioconferences for each committee
# Wiki online interactive workspace
# Regular meetings with RENATER
# Public web site
# 1 Mailing list for each committee
# [...]
* June 2005: Assessment on the first 3 months of community usage
* November 2005: Wiki and public web site merged on a single portal


== Octobre 2005 ==
=== Technical Achievements ===
* Formation à l’utilisation de l’instrument et séminaires: sessions de formation, Ecole Grid’5000 ?
# Prototype:
* Plugtest : demander pour connaître les besoins exactes (1 journée complète : OK). Faire une ½ page pour expliquer le besoin. Probablement Grid’5000 partiel pour plus d’une journée : Denis Caromel & Stéphane Lantéri.
 
== Décembre 2005 ==
* Document rapport des expériences sur 9 mois pour négocier d’autres financements
* Evaluation à mi-parcours : inviter Michel Bidoit, Brigitte, Thierry, + 1 membre du comité scientifique de l’ACI Grid.
 
= Réflexions =
* Réflexions pour augmenter le budget : il faut atteindre au moins 500 CPUs par site pour obtenir les 5000 CPUs. Etablir d’ici fin 2005 un plan de demandes de financement : tous les responsables de sites
* à réfléchir au financement des interfaces 10 Gbps pour RENATER (20 K$) : tous les responsables de sites
 
 
==What has been done so far==
 
# Financial Supports
## "[http://www.recherche.gouv.fr/recherche/fns/grid.htm ACI Grid]" with 2 calls for Grid'5000
## "[http://www.recherche.gouv.fr/recherche/fns/mdonnees.htm ACI Masse de Données]" with GriD eXplorer
## Local fundings (regions + departments)
## INRIA fundings
## 2 "AS CNRS" (Grid5000 and Grid Programming)
# Management and Internal Communication
## 1 Steering Committee + 1 Technical Committee
## Frequent audioconferences for each committee
## Wiki online interactive workspace
## Regular meetings with RENATER
## Public web site
## 1 Mailing list for each committee
## [...]
## 2005-11-14 : Wiki and public web site merged on a single portal
# Technical Achievements
## Grid prototype: 775 machines deployed over 9 sites
## Grid prototype: 775 machines deployed over 9 sites
## Security prototype: operational VPN (VTUN)
## Security prototype: operational VPN (VTUN)
## Control prototype: OAR
## Control prototype: OAR
## Monitoring prototype: Nagios
## Monitoring prototype: Nagios
## [...]
# [...]
## 2005-11-14 : Grid achievement: 1041 machines (2082 CPUs) deployed over 9 sites
# Real size instrument:
## 2005-11-14 : Security achievement: dedicated VLAN (RENATER)
## Grid achievement: 1041 machines (2082 CPUs) deployed over 9 sites
## 2005-11-14 : Control achievement: OAR + KaTools
## Security achievement: dedicated VLAN (RENATER)
## 2005-11-14 : Monitoring achievement: Monika, OARGantt, Ganglia, Nagios
## Control achievement: OAR + KaTools
# Partnerships
## Monitoring achievement: Monika, OARGantt, Ganglia, Nagios
## 3 calls opened (CCTP written and approved by the Steering Committee)
# March 2005: Automated WinXP launch (delay measurment)
### information exchange (Benchmarks, Costs, CPU availability, etc.)
# March 2005: Real size demos (> 1000 CPU)
## 2005-03-15 : 1Gb/s dedicated line between all Grid'5000 sites (RENATER)
=== Partnerships ===
### operational RENATER link for Grenoble
# 3 calls opened (CCTP written and approved by the Steering Committee)
### RENATER probes available for Sophia, Grenoble, Rennes, Orsay, Toulouse (and soon Lyon)
## information exchange (Benchmarks, Costs, CPU availability, etc.)
# Discussions and Brainstormings
# March 2005: 1Gb/s dedicated line between all Grid'5000 sites (RENATER)
## Operating modes: local clusters vs. Grid'5000
## operational RENATER link for Grenoble
## User modes: shared, interactive, batch
## RENATER probes available for Sophia, Grenoble, Rennes, Orsay, Toulouse (and soon Lyon)
## Demos: reboot, network, middleware, applications
=== Discussions and Brainstormings ===
## Experiments census
# Operating modes: local clusters vs. Grid'5000
# Deadlines
# User modes: shared, interactive, batch
## Schedule: partial demo for SC'04 (2004 November)
# Demos: reboot, network, middleware, applications (call for permanent demos)
## Progressive prototype deployment up to 2004 October following a roadmap
# Experiments census (and call for new proposals)
## Switch to real equipment after 2004 October
=== Deadlines ===
## Opening to the full Grid'5000 community after 2005 January
* October 2004: Progressive prototype deployment following a roadmap
## [...]
* November 2004: Partial scheduling ready for SC'04 demos
## 2005-11-14 : Opening to external communities after 2006 January
* December 2004: Switch to real equipment
# External Communication
* January 2005: Opening to the full Grid'5000 community
## see [[Grid5000:Press_releases]] section
* March 2005: Opening to ACI Grid community as soon as possible
* October 2005: Opening to 2nd Plugtest and prepare for SC'05 & PaRI-STIC
* March 2005: Preparing the platform and tutorials for Grid'5000 winter school
* October 2006: Preparing for SC'06, PaRI-STIC & 3rd Plugtest
 
=== External Communication ===
Please have a look at:
* The [[Grid5000:News|news]] section
* The [[Special:G5KPublications|publications]] section
* The [[Grid5000:Press_releases|press releases]] section

Latest revision as of 19:08, 6 October 2006


Project planning

Grid5000 timeline.png

Roadmap

  • December 2005: Assessment on the first 9 months usage
    • Report to Funding Institutions Scientific Committees (Michel Bidoit, Brigitte Plateau, Thierry Priol & 1 ACI Grid member)
    • Brainstorming on how to budgetize at least 500 CPUs at each of the 9 sites (1000 for Orsay) to achieve the 5000 CPUs goal (some sites are already secured)
    • Brainstorming on how to budgetize 10 Gbps interfaces for RENATER (20 k$)
  • March 2006: Organize a Grid'5000 school where users can familiarize with scheduling/deploying tools
    • Opening to ACI Masse de Données & ACI Sécurité communities for the Spring School (reach stability)
  • Mid 2006: Opening to external communities and possibly "best effort" after first users reports

What has been done so far

Financial Supports

  1. "ACI Grid" with 2 calls for Grid'5000
  2. "ACI Masse de Données" with GriD eXplorer
  3. Local fundings (regions + departments)
  4. INRIA fundings
  5. 2 "AS CNRS" (Grid5000 and Grid Programming)

Management and Internal Communication

  1. 1 Steering Committee + 1 Technical Committee
  2. Frequent audioconferences for each committee
  3. Wiki online interactive workspace
  4. Regular meetings with RENATER
  5. Public web site
  6. 1 Mailing list for each committee
  7. [...]
  • June 2005: Assessment on the first 3 months of community usage
  • November 2005: Wiki and public web site merged on a single portal

Technical Achievements

  1. Prototype:
    1. Grid prototype: 775 machines deployed over 9 sites
    2. Security prototype: operational VPN (VTUN)
    3. Control prototype: OAR
    4. Monitoring prototype: Nagios
  2. [...]
  3. Real size instrument:
    1. Grid achievement: 1041 machines (2082 CPUs) deployed over 9 sites
    2. Security achievement: dedicated VLAN (RENATER)
    3. Control achievement: OAR + KaTools
    4. Monitoring achievement: Monika, OARGantt, Ganglia, Nagios
  4. March 2005: Automated WinXP launch (delay measurment)
  5. March 2005: Real size demos (> 1000 CPU)

Partnerships

  1. 3 calls opened (CCTP written and approved by the Steering Committee)
    1. information exchange (Benchmarks, Costs, CPU availability, etc.)
  2. March 2005: 1Gb/s dedicated line between all Grid'5000 sites (RENATER)
    1. operational RENATER link for Grenoble
    2. RENATER probes available for Sophia, Grenoble, Rennes, Orsay, Toulouse (and soon Lyon)

Discussions and Brainstormings

  1. Operating modes: local clusters vs. Grid'5000
  2. User modes: shared, interactive, batch
  3. Demos: reboot, network, middleware, applications (call for permanent demos)
  4. Experiments census (and call for new proposals)

Deadlines

  • October 2004: Progressive prototype deployment following a roadmap
  • November 2004: Partial scheduling ready for SC'04 demos
  • December 2004: Switch to real equipment
  • January 2005: Opening to the full Grid'5000 community
  • March 2005: Opening to ACI Grid community as soon as possible
  • October 2005: Opening to 2nd Plugtest and prepare for SC'05 & PaRI-STIC
  • March 2005: Preparing the platform and tutorials for Grid'5000 winter school
  • October 2006: Preparing for SC'06, PaRI-STIC & 3rd Plugtest

External Communication

Please have a look at: